The gridlock on the Lagos-Ibadan expressway continued on Saturday as commuters lamented the situation which left them stranded in the early hours of the day.
Road users have for the past four days been enduring the gridlock caused by the ongoing construction of the dual carriageway which narrowed the multiple lanes to one on both sides at the Mountain of Fire Ministry end as well as the Asese and Ibafo axis of the road.
Commuters accessing the road from the Lagos end were mainly affected as the drive towards the Ibadan axis took at least two hours to negotiate for a distance of about 10 kilometres.
The impatience of some motorists, especially commercial bus operators, who drive against traffic, worsened the situation, forcing passengers to trek several kilometres.
Officials of the Federal Road Safety Corps, Ogun State command, had a hectic time turning back errant drivers who drove against traffic.
Commercial motorcyclists made brisk business as the fair from Berger Bus Stop to Ibafo was increased to N1, 000 as against N300.
Our correspondent, who monitored the situation on Saturday from the Magboro end of the expressway, observed that the gridlock was compounded by the impatience of motorists.
An Ibadan-bound commercial bus driver, Mr Dele Ali, said he has had to cut down on the number of trips he had hitherto made on the route.
Ali blamed the Federal Government and the construction firms for the delay in completing the ongoing upgrade of the road, adding that commuters were suffering.
He said, “This gridlock along the Lagos-Ibadan expressway had been on and off in the last four years. Unfortunately, there are times that it gets worse and during such periods I normally reduce my trips to and from Ibadan to just one. For me, and others who ply this road on a daily basis, it is a huge loss because the vehicles burn more fuel and the engines overheat while the wear and tear increase.
“This road has taken too long to complete. We know that they are doing the right thing but the construction firms and the Federal Government should expedite action on the pace of work. We continue to suffer for too long.”
A poultry farmer, who was conveying chickens and turkeys from Lagos to Ijebu-Ode, Mr Obinna Nwagboso, had a bad experience as not less than 15 birds died while in the gridlock for two hours on Saturday.
“I do not know who to hold accountable for this, but I never saw it coming. The birds are just dying due to the hot weather condition. This is a huge loss because the turkeys are sold for between N15, 000 and N25, 000,” Nwagboso lamented.
Attempts to get comments from the Ogun State Sector Commander of the FRSC, Mr Clement Oladele, over the traffic control were not successful as he did not pick up calls.
Overriding Public Interest: Delta warns against impeding govt projects
DAN DENT (ASABA)
SPONSORED BY: H&H
Delta State Government has cautioned citizens against impeding projects meant to serve the general public, saying such actions were illegal and constituted an abuse of the law.
Commissioner for Works, Highways and Urban Roads, Comrade Reuben Izeze (middle) discussing with the Chief Press Secretary to the Governor, Sir. Festus Ahon (right) shortly after Inspecting the maintaininers of Uti Road on Wednesday, while the Project Manager Mr. Milad Boutros (left) look on. PIX: SAMUEL JIBUNOR.
The State Commissioner for Works (Highways and Urban Roads), Comrade Reuben Izeze, gave the warning in Effurun on Wednesday during an inspection of the DSC Roundabout Link Road to PTI Junction.
According to him, “no citizen is bigger than the state; I learnt that a citizen has said a particular portion of the road that has been approved cannot be constructed because that is his private property.
“I want to sound it to our people as a note of warning, that, to impede government project in the name of private property is an abuse of the law.
“If your property is on the right of way and we know it is not a road, this administration has made it a point of duty to pay compensation for the use of such properties in the overriding public interest.
“This project has an overriding public interest; if your property is in the right of way and your property has approval, the best we can do, as we have always done, is to give you compensation.
“But to say you stop government officials from doing their job because you feel you are bigger than the government or you are bigger than the law is absolutely unacceptable.”
Commissioner for Works, Highways and Urban Roads, Comrade Reuben Izeze (right) taking the measurements of the Rod while the zonal Chief Engineer Uvwie and Opke local government Area, Engr. Kporon Ennah (left) look on. PIX: SAMUELm JIBUNOR.
Speaking further, he said; “so, we are constructing a drainage that would discharge all the water on this road. If you look at this place, it was originally a swamp.
“Meanwhile, this place had all along been intended to be a road that should take traffic from the East-West Road to reduce the volume of traffic on DSC Roundabout and PTI Junction straight to the Eku highway.
“We have come to see what the contractors are doing and I must express my displeasure at the poor quality of engineering work that I have observed here in this drainage.
“In fact, as things stand, considering the volume of water that will be coming from the Julius Berger projects, the existing volume of water from the swamp.
“What is being done here, therefore, necessitates that this drain be done according to the engineering specifications because the volume of water we will be dealing with is enormous.
“However, on getting down here and measuring the distance between the reinforcements, we discovered that the contractor apparently did not pay attention to details.
“So, I have instructed them to remove everything, start afresh and we will come back. They should not put the reinforcement until I have come to inspect what they have done to be sure that they have complied with the spacing as provided for in the Bills of Engineering Measurement and Evaluation.”
Brutality Victim: Anambra State Executive Council Approves Medical Expenses of Victim
AJAGBE ADEYEMI TESLIM
SPONSORED BY: H&H
Governor Chukwuma Charles Soludo undertakes the medical expenses of a victim of brutality by some contractors of the Anambra State Waste Management Authority (ASWAMA), Mr. Okechukwu Akaneme.
Soludo
The governor took this humanitarian decision to relieve the victim while strongly denouncing such despicable conduct. In addition to the governor’s gesture, the contractor has been relieved of his engagement with the state agency (ASWAMA) immediately, to serve as a deterrent to others.
In a statement by the Commissioner for Information, Law Mefor, the victim who was assaulted is being hospitalised.
The Council has resolved to pick up his medical overheads, while sympathising with Akaneme ‘s family and prays for his quick recovery.
This profound empathy reflects Soludo’s sincere dedication to offering not just solutions but also a genuine commitment to providing helping hands, support, and hope to the people whenever and wherever required in the state.
END
Press Release
Anambra State Executive Council Awards More Road Contracts
The 37th Anambra State Executive Council (ANSEC) has awarded the contracts for the construction of new roads in the state in preparation for the yuletide season.
This is aimed at ensuring a memorable Christmas for Ndi Anambra, who will be celebrating the season in the state, from across the country and other parts of the globe.
In a release by the Commissioner for Information, Law Mefor, ANSEC at its 37th Meeting, approved the construction of the 3.75 km Igwe Orizu Road, in Nnewi, to New Idea Construction Company Ltd, and to be completed within six months.
The 10.8 km Nkwor Nnewi to Nkwor Oraifite was awarded to Infratech Construction Ltd at N7.2 billion, with a 12-month completion timeline, while the Oraukwu-Abatete-Nimo bypass in Idemili North measuring 4.922km was awarded to GMG Global Construction and Development Company Ltd, with a delivery date of six months.
At the meeting, the Council observed that many roads awarded at the last executive council meeting, including the New Tarzan Road and the three roads whose contracts were revoked and re-awarded, have not been reported.
Recently, Governor Soludo kept his promise with the completion of the 12.5km Ezira-Umuomaku-Enugu Umuonyia-Achina Road, linking several communities, and the 11.9km Mmiata-Anam-Nzam road, linking the headquarters of Anambra West Local Government Area (LGA).
With the ongoing and completed road projects in the state, Governor Soludo has literally turned Anambra into a construction site in his pursuit of transforming the state into a country-wide destination brand.
LAWMA HOLDS 2024 CHRISTMAS CAROL/END OF THE YEAR THANKS-GIVING
AJAGBE ADEYEMI TESLIM
SPONSORED BY: H&H
The Lagos Waste Management Authority (LAWMA), has held its annual Christmas Carol and End of the year thanksgiving service, to appreciate God for his goodness and blessings in the out-going year.
The event took place at the authority’s headquarters, Ijora-Olopa, witnessed by LAWMA’s management team, staff, neighbours, friends and well-wishers.
In his welcome address, the Managing Director/CEO of LAWMA, Dr. Muyiwa Gbadegesin, thanked God for his mercies and blessings upon the workers of the authority in the out-going year despite challenges.
He said “Today is not a day for speeches but a day for praises and thanksgiving. I appreciate God for his mercies and blessings upon the staff of LAWMA, and I pray he will continue to preserve us as we dedicate our time to service.”
Also, he appreciated members of staff for their support, encouraging them to keep up the good work.
While wishing Lagos residents a merry Christmas and a prosperous new year, he urged residents to always carry out their own obligations towards the environment, and to support the efforts of the authority, in maintaining a clean and liveable Lagos city.
The Executive Director, Finance, Mr. Kunle Adebiyi, thanked God for preserving the lives of LAWMA staff, and for making them witness this year’s thanks-giving service, noting that it was important to keep praising God.
He acknowledged the efforts of Dr. Muyiwa Gbadegesin towards improving waste management operations in the state, to achieve a people-friendly environment.
Delivering a sermon on the event’s theme, “With a grateful heart”, the chapel’s president, Mr. Olawumi Oluwaseyi, urged people to always express gratitude to God, for consistent protection from danger, as he committed every member of the authority into God’s hands, seeking for his grace and mercy.
The first Bible reading of the day was by the LAWMA boss, taken from the book of Genesis 3:8-15, while the second reading was from Genesis 22:15-18, by the executive director Finance.
Other management staff who read Bible passages included Mrs. Folashade Kadiri, head, Public Affairs; Mr. Adewumi Adetona, head, Advocacy; Dr. Essien Nsuabia, head, Waste Management Development Research; Mrs. Opayemi Abimbola, head, Commercial Services; Mrs. Bola Adewumi, head, LAWMA Academy; Dr. Modupe Okoh, head, Medical Services, Health and Safety; among others.
The high point of the event was the special song ministration by the guest minister, Sarah Apekeola; rendition of hymns and songs by the Emmanuel Chapel choir, as well as choreographic ministration by the chapel’s children.